Mon–Sat 9:00–19:00 (UTC+8)

Custom Artificial King Palm Tree for Hotel Atriums & Lobbies

Application: Hotel Atriums & Lobbies · Custom heights 4–8 m

We build custom artificial king palms for hotel atriums and lobbies — 4–8 m specimens, NFPA 701 fire-retardant treatment available as an option, engineered per project. Atrium trees must read from three floors up, pass a fire inspection, and still look right in a guest's photo years later. We engineer specimens from 2 to 12 m that do all three, delivered and installed worldwide.

  • Wind-load rated steel core, engineered per site
  • UV-treated fronds · 3–5 year outdoor color-fastness
  • Numbered fronds and marked trunk joints for site assembly
Technical Specifications

King Palm Tree Build Spec

Unit Size4–8 m, canopy 2.5–4 m
Height Range2–12 m (customizable to your photos or drawings)
TrunkFibreglass trunk shell over a galvanized steel core, finished with natural palm-ring detailing.
FoliagePE and PU materials; optional UV-resistant finish for outdoor use.
BaseSteel plate base — set in concrete or installed in a planter.
Fire RetardancyOptional NFPA 701 / BS 5867.
MaintenanceNo routine maintenance — no watering, feeding or leaf cleanup.
Lead TimeStandard builds 25–35 days; custom builds 45–60 days.
Sizing & Compliance for Hotel Atriums & Lobbies

What This Venue Needs

Sizing

Specimens run 2–12 m; above the height that fits a container upright they are engineered knock-down and assembled in place, with rigging notes for your contractor.

Compliance & Anchoring

NFPA 701 fire-retardant foliage is available as an option, with EN 13501 B-s1,d0 available for EU hotels. Base-plate loading and anchoring details ship with every large build.

Project Specification

King Palm Tree specified for Hotel Atriums & Lobbies

King Palm Tree (SKU VW-PAL-600) is quoted at 4–8 m for hotel atriums and lobbies, against the 2–12 m height band this venue is engineered for. The review pack is assembled for a hotel operator, not a single buyer.

Buying parameters for this venue

Reference SKUVW-PAL-600
Species height range4–8 m
Venue height band2–12 m
Base & fixingKnock-down assembly · Rigging notes supplied
DocumentationFor VW-PAL-600: NFPA 701 fire-retardant foliage is available as an option, with EN 13501 B-s1,d0 available for EU hotels. Base-plate loading and anchoring details ship with every large build.
Lounge canopy, Germany project
Lounge canopy, Germany project

Installation, materials & documentation

Installation is scheduled around guest access: the crown arrives in numbered rings and the trunk as engineered knock-down parts that bolt to the base plate inside a closed work zone, and the area reopens only after the anchoring check is signed off.

The submittal pack carries the foliage fire report, base-plate loading and the sprinkler-clearance drawing. Housekeeping receives a branch-ring map so reachable sections can be lifted off for cleaning without closing the lobby.

Buyer Questions

Ordering & Specification FAQs

What buyers ask when specifying king palms for hotel atriums and lobbies — MOQ, lead time and this venue's requirements.

MOQ is project-based rather than per-SKU, and for king palms a single 4–8 m specimen is a realistic starting order — the canopy is fixed at 2.5–4 m unless you ask for a different crown. Quotation is built per tree and per project, so a single replacement palm and a full concourse scheme are both quoted the same way.

25–35 days for standard builds, and 45–60 days for custom builds. Lead time starts from approved drawings rather than from the enquiry. Crowns and trunks are packed separately and fronds are numbered for site assembly, so the assembly sequence has to be agreed with your crew before shipment.

Yes — NFPA 701 fire-retardant foliage is available as an option on every tree, and EN 13501 B-s1,d0 is available for EU projects, with batch test reports archived against your order.

Yes. Crown scale and trunk detailing are drawn to the sight lines of your specific atrium, so the tree looks right at 3 m and at 10 m alike.

Yes — 4–8 m, with the crown built to read correctly from upper floors and the fronds numbered at the factory so your crew can assemble the tree inside a finished building. Trunk finish, frond density and the base method are all drawn against your project; send the venue drawing and we return CAD options within 12 business hours.

Configure This Tree for Your Hotel Atriums & Lobbies

Height, trunk finish, foliage density, planter and base plate — tell us the venue and we'll send CAD options within 12 business hours.

WhatsApp an Engineer All Solutions