Mon–Sat 9:00–19:00 (UTC+8)

Custom Artificial Date Palms for Middle East Resorts & Plazas

SKU: VW-DAT-500 · Custom heights 4–9 m

The courtyard palm of the Gulf: a straight fibreglass trunk, a dense PE frond crown, and a finish that holds its shape through desert heat and interior air conditioning alike.

  • Straight trunk profile, matched pairs available
  • Dense UV-stabilised frond crown
  • Trunk finish detailed to natural date palm
  • Galvanized core on builds above 5 m

Spec sheet (PDF) is generated per project configuration — request it via the quick RFQ and our engineers will attach it to your quotation.

Technical Specifications

Full Engineering Spec

ItemDescription
Unit Size4–9 m, canopy 3–5 m
Height Range2–12 m (customizable to your photos or drawings)
TrunkStraight fibreglass trunk with a diamond-pattern finish; galvanized core on builds above 5 m.
FoliagePE and PU materials; optional UV-resistant finish for outdoor use.
BaseSteel plate base — set in concrete or installed in a planter.
Fire RetardancyOptional NFPA 701 / BS 5867.
MaintenanceNo routine maintenance — no watering, feeding or leaf cleanup.
Lead TimeStandard builds 25–35 days; custom builds 45–60 days.
Customization Options

Specified Per Project, Not Picked From a List

Every dimension below is quoted to your drawings — the same table our engineers work from when they return CAD options.

01

Height & Dimensions

Built to order across 4–9 m — proportioned to your ceiling clearance and sight lines.

02

Trunk & Structure

Straight fibreglass trunk with a diamond-pattern finish; galvanized core on builds above 5 m.

03

Foliage & Canopy

Dense UV-stabilised PE frond crown.

04

Planter & Base

Round or square cast planter with a concealed base plate.

Factory QC & Export

How This Tree Is Built, Checked and Shipped

In-process checkpoints from frame welding to container loading, photographed on our own production line.

Workers laminating fiberglass over long palm trunk molds inside a production workshop

Trunk Moulding

Fiberglass laminated by hand over steel-cored moulds, ring by ring.

Digital caliper measuring the wall thickness of a steel pipe used in artificial tree frames

Material QC

Steel core wall thickness verified by caliper against the structural spec.

Wrapped artificial palm trunks on steel racks loaded inside a container truck at night

Container Loading

Film-wrapped trunks racked and braced for the container crossing.

Recommended Applications

Where Buyers Specify the Date Palm Tree

Each page below covers this tree type in that venue category — codes, ceiling heights and the anchoring each space calls for.

Buyer Questions

Ordering & Specification FAQs

The five questions that come up most often on this specification, answered against the actual build.

MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.

Yes — height, trunk finish, foliage density, planter and base plate are all specified per project. Send the venue drawing or a reference photo and our designers return CAD options within 12 business hours.

25–35 days for standard builds, and 45–60 days for custom builds. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.

Most trees ship fully assembled; long specimens are braced on timber cradles. Foliage is flat-packed and planters nest to cut volume. A piece-by-piece CBM packing sheet ships with every quotation, so you can price the container before you commit.

Yes. SGS-tested 3–5 year colour-fastness suits courtyard and streetscape use, and the trunk is finished to hold through desert heat and interior air conditioning alike.

Configure This Tree for Your Project

Height, trunk finish, foliage density, planter and base plate — tell us the venue and we'll send CAD options within 12 business hours.

WhatsApp an Engineer See Installed Projects