Incoming Quality Control and Pre-Shipment Inspection
Project Background
We inspect foliage colour, bark finish, trunk straightness and section fit before anything is crated. Buyers are welcome to audit the factory in person, and the same checklist applies whether the order is one tree or forty.
Specifications
| Foliage check | Colour consistency across the tree and the order |
|---|---|
| Structure check | Trunk straightness and joint alignment |
| Finish check | Bark adhesion and paint coverage |
| Fit check | Section mating before crating |
| Records | Inspection checklist issued per project on request |
Client Challenge
Colour mismatch across a batch is the defect buyers complain about most often, because it is visible the moment the trees are installed and cannot be fixed without replacing foliage panels.
Solution
Foliage is batched to a master colour reference before assembly, and each tree is checked against the previous tree in the same order. The inspection sheet records what was checked so your site team can rely on it.
Welding & Production Photos



Final Installation

More projects
- In-House Steel Core Welding for Large Specimen Trees
- Hand-Carved Bark Finishing, One Trunk at a Time
- Export Packing and Container Loading
- Olive Tree Finishing Variants — Bonsai, Shrub and Landscape Forms
- Outdoor UV Exposure and Colour Retention
- Fire-Rated Foliage for Public Venues
- Coconut & Date Palm Scape for a Water Park in Southern Spain
- Cherry Blossom Terrace for a Shopping Centre in the UK
- Poolside Coconut Palms for a Beachfront Resort in Australia
- Glamping Lounge Planting for a Corporate HQ in Germany