Export Packing and Container Loading
Project Background
Artificial trees ship as break-down sections, not as whole trees. Getting the section count, the packing method and the container plan right is what separates a clean arrival from a damaged consignment — and it is decided before the tree is built.
Specifications
| Packing | Individual sections, foam-wrapped and boxed |
|---|---|
| Cartons | Export cartons with company marking and shipping marks |
| Container types | 20GP / 40HQ / 40HQ flat rack for oversized trees |
| Loading plan | Issued per project with a piece-by-piece container map |
| Documentation | Packing list, assembly drawing, care instruction |
Client Challenge
Oversized trees do not fit a standard container, and a mis-planned load wastes the freight budget or arrives with crushed canopies. Buyers also need assembly drawings on site, because a 9-metre tree arrives as separate sections that must be assembled.
Solution
We measure the finished tree, then produce a container map showing which sections travel in which container and in what order. The packing list and assembly drawing ship with the consignment so your installer can reassemble it on site.
Welding & Production Photos



Final Installation

More projects
- In-House Steel Core Welding for Large Specimen Trees
- Hand-Carved Bark Finishing, One Trunk at a Time
- Incoming Quality Control and Pre-Shipment Inspection
- Olive Tree Finishing Variants — Bonsai, Shrub and Landscape Forms
- Outdoor UV Exposure and Colour Retention
- Fire-Rated Foliage for Public Venues
- Coconut & Date Palm Scape for a Water Park in Southern Spain
- Cherry Blossom Terrace for a Shopping Centre in the UK
- Poolside Coconut Palms for a Beachfront Resort in Australia
- Glamping Lounge Planting for a Corporate HQ in Germany