
Artificial Japanese maple trees in Dubai, UAE
Supplier: Dubai, UAE · Custom heights 1.8–4 m
We supply artificial Japanese maple trees to Dubai, UAE — custom heights 1.8–4 m, NFPA 701 foliage available as an option and UV-stabilised options for outdoor placement. Shipping to Jebel Ali, roughly 18-24 days by sea from Yantian or Shenzhen, FOB or DDP on request.
- Matched sets for corridors and reception rows
- Trunk lean set to your scheme, or kept plumb for pairs
- Multi-tone foliage blending available
Japanese Maple Tree Build Spec
| Unit Size | 1.8–4 m, canopy 1.5–3 m |
|---|---|
| Height Range | 1–6 m (customizable to your photos or drawings) |
| Trunk | Sculpted fiberglass trunk, set to a specified lean or kept vertical for matched pairs. |
| Foliage | PE and PU materials; optional UV-resistant finish for outdoor use. |
| Base | Steel plate base — set in concrete or installed in a planter. |
| Fire Retardancy | Optional NFPA 701 / BS 5867. |
| Maintenance | No routine maintenance — no watering, feeding or leaf cleanup. |
| Lead Time | Standard builds 7–10 days; custom builds 15–20 days. |
What Supplying Dubai, UAE Involves
Port & Transit
Main port: Jebel Ali. Transit roughly 18-24 days by sea from Yantian or Shenzhen. We quote FOB or DDP and issue a piece-by-piece CBM packing sheet so your forwarder can plan the container before the goods ship.
Certification & Climate
NFPA 701 foliage available as an option; EN 13501 B-s1,d0 and UAE Civil Defence documentation available on request. Extreme summer heat and very high UV. Outdoor and glass-atrium placements must specify UV-stabilised foliage; fully air-conditioned interiors need no treatment at all.
Dubai's hospitality, mall and airport pipeline runs on tight fit-out windows and high-spec finishes. We quote DDP into Jebel Ali as readily as FOB, and issue a piece-by-piece CBM packing sheet so your forwarder can plan the container before the goods ship.
Other Artificial Trees We Ship to Dubai, UAE
Other artificial trees we supply in Dubai, UAE: Artificial Fruit Tree · Fiddle-Leaf Fig · Monstera / Split-Leaf · Mediterranean Olive Tree
Ordering & Shipping FAQs
What buyers ask when importing Japanese maple trees into Dubai, UAE — MOQ, lead time, ports and local compliance.
MOQ is project-based rather than per-SKU, and you can mix and match across the catalogue. A hotel atrium package and a single replacement specimen are both quoted the same way — tell us the venue and the quantity, and the quotation is built around that project.
7–10 days for standard builds, and 15–20 days for custom builds. Lead time starts from approved drawings rather than from the enquiry, so the drawing turnaround is the part worth confirming early.
Yes. We ship to Jebel Ali and onward across the UAE, quoting FOB or DDP depending on how you handle customs. Transit is roughly 18-24 days by sea from Yantian or Shenzhen, and a piece-by-piece CBM packing sheet ships with every quotation.
NFPA 701 fire-retardant foliage is available as an option, and EN 13501 B-s1,d0 can be supplied for projects that specify it. Batch test reports are archived against your order number so your fire consultant can retrieve them later.
Yes — 1.8–4 m, with the trunk lean set to your scheme or kept plumb for matched pairs, and multi-tone foliage blending available.
Get a Landed Quote for Dubai, UAE
Height, trunk finish, foliage density, planter and base plate — tell us the project and we'll return FOB and DDP pricing with a CBM projection within 12 business hours.