/products/size/statement
SIZE BAND

Artificial Trees 7 m and above

Statement trees for resort grounds and landmark installations.

Above 7 m, every project is bespoke engineering with a tree on it. These are the trees in hotel atrium photography and mall landmark corners — and they succeed or fail on logistics: section weights the lift can take, flange positions hidden inside the botanical detail, and an assembly sequence written for the site's actual crane or scaffold situation. We have delivered to 12 m; the record for any height above is set by the building, not by us.

  • Full bespoke engineering: structural drawings, section-by-section weight map, site assembly sequence.
  • Concealed flange and sleeve joints engineered into the botanical silhouette — no visible banding at eye level.
  • Delivered heights to 12 m; above that, feasibility is a building question we will assess honestly.

Common questions

What is the maximum height you can deliver?

We have delivered 12 m for a resort atrium. Beyond that, the limiting factor is never the tree — it is lift capacity, crane access and structural sign-off. Send the building drawings and we will return an honest feasibility note with a suggested section breakdown before any commitment.

How long does a 10 m statement tree take?

Eight to ten weeks is typical: two weeks engineering and mould adjustment, four to five weeks production and finish, then freight matched to your fit-out window. Assembly on site runs one to two days with a supervisor from our team or a trained local crew under video guidance.

Common questions

What is the maximum height you can deliver?

We have delivered 12 m for a resort atrium. Beyond that, the limiting factor is never the tree — it is lift capacity, crane access and structural sign-off. Send the building drawings and we will return an honest feasibility note with a suggested section breakdown before any commitment.

How long does a 10 m statement tree take?

Eight to ten weeks is typical: two weeks engineering and mould adjustment, four to five weeks production and finish, then freight matched to your fit-out window. Assembly on site runs one to two days with a supervisor from our team or a trained local crew under video guidance.