Mon–Sat 9:00–19:00 (UTC+8)

King Palm Tree

SKU: VW-PAL-600 · Custom heights 4–8 m

Mall-atrium scale. The crown is built to still read correctly from three floors up, while the segmented trunk lets your rigging crew assemble the tree inside a finished building.

  • Wind-load rated steel core, engineered per site
  • UV-treated fronds · 3–5 year outdoor color-fastness
  • Numbered fronds and marked trunk joints for site assembly
  • Crowns and trunks packed separately for tight CBM

Spec sheet (PDF) is generated per project configuration — request it via the quick RFQ and our engineers will attach it to your quotation.

Technical Specifications

Full Engineering Spec

Height Range4–8 m
Trunk MaterialFibreglass trunk shell over a galvanized steel core, finished with natural palm-ring detailing.
Foliage / Leaf FabricUV-treated PE fronds, pre-shaped and numbered at the factory for site assembly.
Planter & BaseCast planter or a recessed floor plate with concealed anchoring.
Fire Retardant ClassNFPA 701 fire-retardant foliage as standard; EN 13501 B-s1,d0 available for EU projects.
UV / Outdoor RatingCovered outdoor use: 3–5 years color-fastness with the UV add-on.
Wind ResistanceInterior rated as standard; exterior builds engineered per site wind-load and documented per project.
Packing & HandlingMost trees ship fully assembled; long specimens are braced on timber cradles. Foliage flat-packed and planters nested to cut volume. A piece-by-piece CBM packing sheet ships with every quotation.
Container Yield~9 pcs of 6 m king palms per 40 ft HQ — crowns packed separately from the trunks.
Typical ApplicationsShopping malls, airport concourses, hotel lobbies, resort colonnades.
Lead Time25–35 days for standard heights; 45–60 days for custom builds above 6 m.
MOQProject-based; mix-and-match across catalog SKUs.
CertificationsNFPA 701 · SGS UV · CE · RoHS · ISO 9001

Configure This Tree for Your Project

Height, trunk finish, foliage density, planter and base plate — tell us the venue and we'll send CAD options within 2 business hours.

WhatsApp an Engineer See Installed Projects